Press picked from memory
- Flash on thin-walled lids or large flat covers
- Parting line witness that grows as pack pressure rises
- Tool damage when operators compensate with higher pack
Glossary
Clamping force is what keeps the parting line shut while the cavity fills and packs.
Glossary
Why tonnage shows up on RFQs, and what flash really means for your parting line.
During fill and pack, molten plastic exerts pressure on every surface inside the mold. Clamping force is the closing force the press applies so the two halves stay sealed.
When available clamp is too low for projected area and resin pressure, the parting line opens slightly. You see flash, dimension drift, or oil contamination on the seam instead of a clean shutoff.
NetProto sizes production on hardened steel tools for real fill conditions. Upload CAD so projected area and material family enter the conversation before someone picks a press from habit.
Production
Photos from the floor rarely show tonnage labels, but flash tells the story.

Sizing
Tonnage is not a badge. It is a ceiling on how hard the machine can hold the mold closed.
RFQ notes
These inputs change clamp math more than most buyers expect.
Largest projected area view with parting direction marked
Resin family or known fill pressure class, even if grade is TBD
Cosmetic class on the parting line versus hidden faces
Multi cavity layout if you already assume more than one impression
Go deeper
Each link is a different angle on the same program, not a duplicate definition.
How shops name clamp capacity on the machine nameplate.
TonnageWhere plastic enters and how pack reaches the last fill region.
GateWall, draft, and gate rules that change fill pressure.
Design guide hubLong form guide for engineers freezing CAD.
DFM articleVisual reference
Images are selected from the NetProto Forge media library for this topic.

Injection molding press on the production floor
Injection molding press on the production floor

Close up of a molded part parting line
Close up of a molded part parting line

Plastic enclosure components after molding
Plastic enclosure components after molding
FAQ
Tonnage is how North American catalogs express available clamp on a press. The idea is the same: how hard the machine can hold the mold closed.
You can state constraints, but the molder still must validate projected area, flow length, and pack strategy against the tool they build.
Not by itself. Excess tonnage does not fix poor gate location, inadequate venting, or a parting line that telegraphs on a cosmetic face.
Next step
Upload CAD for a hardened steel tool quote with production piece price on the same program.