T1 samples are the first molded parts off a new tool for initial review.
Glossary
T1 is a milestone, not a promise that production window is fully locked.
First shots reveal gate vestige, shrink, warp, and texture transfer before process tuning continues.
Steel adjustments and process changes can follow T1 depending on results.
Buyers should inspect critical dimensions, Class A faces, and fit to mating parts.
Glossary
Library photos illustrate molding and tooling context for this term.

Inspection
Photos and measured data shorten approval threads.
Critical dimensions versus drawing with instrument list
Gate vestige and parting line on cosmetic faces
Color and texture match to approved sample or plaque
Fit to mating parts or fixtures called out on drawing
Go deeper
Each link is a different angle on the same program, not a duplicate definition.
Structured report beyond T1 timing.
First article inspectionVestige seen first on T1.
GateCapability after process stabilizes.
Process capabilityDFM issues visible on T1.
Design guide hubVisual reference
Images are selected from the NetProto Forge media library for this topic.

Injection molded production parts on a tray
Injection molded production parts on a tray

Engineer reviewing a molded part drawing
Engineer reviewing a molded part drawing

Plastic housing components from a steel tool
Plastic housing components from a steel tool
FAQ
Not always. Process tuning and steel changes can follow.
Only when your quality plan allows pre production shipments.
Corrective action may include steel, process, or drawing revision.
Next step
Upload CAD with critical dimensions flagged before first shots.