Skip to content
NetProto

Glossary

What Is First Article Inspection? Injection Molding Explained

First article inspection is a documented measurement report for early production approval.

Glossary

First article inspection documents measured results against the drawing for early approval

FAI is a structured report, not just the timing of first shots.

FAI scope lists features measured, instruments used, and acceptance criteria.

Regulated and automotive style programs often require FAI elements even outside full PPAP.

T1 timing and FAI reporting can overlap but serve different quality gates.

Quality

FAI ties the first shots to the drawing

Inspection photos belong in the PPAP thread for automotive programs.

  • Ballooned prints reduce back and forth on critical dimensions.
  • CMM reports should match the CAD revision on the PO.
  • Sample approval gates production release on qualified programs.
Engineer reviewing injection molding terminology on a part drawing

Timing

T1 versus FAI vocabulary

Use precise words in supplier threads.

TermTypical meaning
T1First shots off the tool for review
FAIDocumented inspection report against drawing
PPAPBroader approval package on automotive style RFQs

Go deeper

Where this term connects

Each link is a different angle on the same program, not a duplicate definition.

PPAP

Automotive style approval package.

PPAP

Visual reference

Photos from molding and tooling programs

Images are selected from the NetProto Forge media library for this topic.

Coordinate measuring machine inspection

Coordinate measuring machine inspection

Coordinate measuring machine inspection

First article plastic parts with labels

First article plastic parts with labels

First article plastic parts with labels

Quality technician measuring molded part

Quality technician measuring molded part

Quality technician measuring molded part

FAQ

FAI questions

Is FAI the same as T1?

T1 is timing of first shots. FAI is structured inspection documentation.

Who defines FAI scope?

Drawing and quality plan on the RFQ define features and instruments.

Does every program need FAI?

Only when the RFQ or customer quality plan requires it.

Next step

Define quality packages on RFQ

Upload CAD and inspection requirements with production quotes.