T1 samples
When first parts exist.
T1 samplesGlossary
First article inspection is a documented measurement report for early production approval.
Glossary
FAI is a structured report, not just the timing of first shots.
FAI scope lists features measured, instruments used, and acceptance criteria.
Regulated and automotive style programs often require FAI elements even outside full PPAP.
T1 timing and FAI reporting can overlap but serve different quality gates.
Quality
Inspection photos belong in the PPAP thread for automotive programs.

Timing
Use precise words in supplier threads.
| Term | Typical meaning |
|---|---|
| T1 | First shots off the tool for review |
| FAI | Documented inspection report against drawing |
| PPAP | Broader approval package on automotive style RFQs |
Go deeper
Each link is a different angle on the same program, not a duplicate definition.
When first parts exist.
T1 samplesAutomotive style approval package.
PPAPCpk after process stabilizes.
Process capabilityProduction quality context.
Plastic moldingVisual reference
Images are selected from the NetProto Forge media library for this topic.

Coordinate measuring machine inspection
Coordinate measuring machine inspection

First article plastic parts with labels
First article plastic parts with labels

Quality technician measuring molded part
Quality technician measuring molded part
FAQ
T1 is timing of first shots. FAI is structured inspection documentation.
Drawing and quality plan on the RFQ define features and instruments.
Only when the RFQ or customer quality plan requires it.
Next step
Upload CAD and inspection requirements with production quotes.