First article inspection
Often inside PPAP bundles.
First article inspectionGlossary
PPAP is a structured approval package proving molding process capability and control.
Glossary
Non automotive buyers sometimes request PPAP elements on safety critical parts.
PPAP bundles FAI, control plans, capability studies, and material records per customer rules.
Not every NetProto program requires PPAP unless the RFQ defines that package.
Early RFQ clarity avoids discovering PPAP scope after tooling is cut.
Glossary
Library photos illustrate molding and tooling context for this term.

RFQ
Confirm which elements apply to your program tier.
PPAP level requested
Dimensional results and capability requirements
Material and color approval paths
Control plan and reaction plan expectations
Go deeper
Each link is a different angle on the same program, not a duplicate definition.
Often inside PPAP bundles.
First article inspectionCpk studies for PPAP.
Process capabilityParts feeding early reports.
T1 samplesData supporting stable process.
Scientific moldingVisual reference
Images are selected from the NetProto Forge media library for this topic.

Injection molded production parts on a tray
Injection molded production parts on a tray

Engineer reviewing a molded part drawing
Engineer reviewing a molded part drawing

Plastic housing components from a steel tool
Plastic housing components from a steel tool
FAQ
Only when the RFQ defines that quality package.
Elements roll out as tool and process mature.
Origin is automotive but other industries borrow elements.
Next step
Upload CAD with PPAP or FAI requirements on regulated RFQs.