Will piece price change after resin lock?
Yes, resin and cycle assumptions update with grade.
Quote sequence
Teams often need tooling budget approval while resin selection is still in parallel with supplier samples.
Quote sequence
Geometry and tooling assumptions can start before the final TDS row is frozen.
Teams often need tooling budget approval while resin selection is still in parallel with supplier samples.

Upload CAD with a performance filter and mark material as pending in quote notes so DFM can proceed on geometry.
Changing resin later may require shrink and fill revalidation even when steel stays the same.
Quote checklist
Copy these fields into your RFQ or instant quote notes.
3D CAD at quote revision
Performance filter (heat, impact, chemical)
Two candidate families if known
Note material pending explicitly
Examples
Weak callouts widen assumptions; specific grades tighten quotes.
| Field | Too vague | Better |
|---|---|---|
| DFM | Draft, ribs, undercuts | Before resin lock |
| Tooling direction | Steel quote assumptions | Before resin lock |
| Piece price | Tightens after grade | After resin lock |
Instant quote
NetProto quote flow: upload, specify assumptions, review, submit.
STEP with revision.
List filters and candidates.
Link injection molding DFM article internally.
Update quote notes and PO.
FAQ
Yes, resin and cycle assumptions update with grade.
Only if later resin fits the validated shrink window.
Geometry issues are visible; fill and warp need resin for final sign-off.
Related
Links render in cards blocks only.
Design guide.
Injection molding DFMTooling spoke.
Mold tooling costStart here.
Instant quote platformNext step
Use the instant quote platform for pricing visibility tied to your geometry.