Does the Instant Quote Include Tooling and Piece Price?

Yes. The instant quote shows the steel tool charge and molded piece price as two lines. Secondary ops, freight and Incoterms appear only when noted. Upload CAD.

6 min read

Does the Instant Quote Include Tooling and Piece Price?

What Does an Instant Quote Include?

Buyers ask does instant quote include tooling and piece price when they see one number and do not know if the mold is in it. The instant estimate separates the one-time injection mold tooling charge from the piece price of molded parts at the quantities you enter. Both lines sit on the same quote so teams can compare program fit before approving tool build.

The first click is still an estimate until DFM review closes. Read why instant quote changes after CAD review. For cost drivers on the tool line, read what drives injection mold tooling cost. This page only explains the two lines.

Key Facts

  1. Tooling charge is the steel tool, paid once on the scoped program.
  2. Piece price is the molded part at the quantities you typed.
  3. The customer owns the tool once the tooling charge is paid and can request it.
  4. Secondary operations appear only when you note them on the RFQ.
  5. Freight and Incoterms are not a hidden third line on the first click unless you add them.
  6. No dollar amounts or lead times appear on this page.
  7. Upload CAD on the injection molding instant quote platform.

How to Read the Two Lines

The tool is paid once. The part is paid per the quantity you typed.

Tooling line movers: cavities, slides, texture, steel path

The tooling line moves when steel scope changes: a slide, a texture system, a shutoff, or a different steel path. A smaller first lot does not rewrite that line by itself. See what drives injection mold tooling cost.

Piece-price line movers: resin, quantity, cycle, secondary ops

Piece price moves when resin, quantity, cycle assumptions, or noted secondary operations change. A smaller first lot belongs here. That is also no MOQ injection molding quotes: quantity is a piece-price field, not a second tool product.

Lifetime mold support is not free repair, storage, or design changes

Lifetime mold support means the same tool keeps running on repeat orders and the tooling charge is not billed again. Lifetime mold support means the tool keeps running, not that engineering changes are free. It is not free repair, free storage, or free design changes. Write that meaning next to the phrase if a teammate reads it as free maintenance.

What to Add in Notes So the Lines Stay Honest

Secondary operations: pad print, paint, assemble, pack

Inserts, overmold skins, and decoration. Inspection or regulated scope. If those items are silent, the first click prices a simpler program than the one you will buy. Pad print, paint, assemble, and pack stay off the first estimate until you note them.

Customer-supplied resin sits outside the material assumption

Customer-supplied resin is not inside the piece-price line by default. Write it on the RFQ so reviewers price the run, not a NetProto-supplied pellet. Handling, drying, or scrap still need a note if they change the run.

Freight and Incoterms are a third conversation, not a hidden third line

Freight and Incoterms are not a hidden third line on the first click unless you add them. Do not treat the two-line quote as a landed program price.

RFQ Checklist

Numbered steps:

  1. Confirm you see a tooling line and a piece-price line.
  2. Enter first-order and annual quantities.
  3. Note secondary operations you want on the first shipment.
  4. Note inserts, a second material, or customer-supplied resin.
  5. Upload CAD through the injection molding instant quote platform.

If you only see one blended number in an export, ask for the split. One blended number is two undocumented assumptions. Comparing a blended number to a split number is how programs get approved on the wrong basis.

A Worked Example

A buyer forwards one blended number to finance and calls it the mold quote. Finance asks if parts are included. Nobody can answer from that export. Open the quote and read two lines. The tooling charge is the steel tool, paid once. The piece price is the molded part at the quantities you typed.

If the first shipment also needs pad printing, that work is not on the first click unless you noted it. Add the decoration note and re-quote. Do not assume a blended number hid the print operation.

When the second order arrives, the tooling charge should not appear again. If a teammate expects a second tool bill, point them at ownership: the customer owns the tool once the tooling charge is paid. Repeat parts run on that tool.

Common Mistakes

Comparing a blended competitor number to a split NetProto number without lining up the two lines.

Leaving secondary operations off the RFQ and then treating the first click as a landed program price.

Asking for the tooling charge to drop because the first lot is small. The tool is the same product. Quantity moves piece price. See no MOQ injection molding quotes.

Using the lifetime phrase as if repair and design changes were free. Write the approved meaning next to the phrase.

What to Tell Sourcing

Ask for the split every time. Tooling charge. Piece price. If a secondary operation matters on the first shipment, it must be on the RFQ or it is not in the first click.

Ownership is simple: once the tooling charge is paid, the customer owns the tool and can request it. Repeat orders do not pay that charge again.

If they compare a competitor blended number, ask that competitor for the same split before the meeting. Otherwise you are comparing two different documents.

Do not use a small first lot as a reason to demand a different tool product. Quantity belongs on the piece-price line.

Quote guides

Related quote and RFQ guides

Next articles in this cluster. Files, RFQ fields, and what happens after you accept.

Frequently Asked Questions

Does the instant quote include tooling and piece price?

Yes. The instant estimate separates the one-time injection mold tooling charge from the piece price of molded parts at the quantities you enter. Both lines sit on the same quote. The first click is still an estimate until DFM review closes.

Is the tooling charge paid again on a repeat order?

No. The tooling charge is paid once on the scoped program. Repeat orders run on the same tool. Lifetime mold support means that tool keeps running. It does not mean free repair or free design changes.

Who owns the mold after the tooling charge is paid?

The customer owns the tool once the tooling charge is paid and can request it. Ownership is not a second quote line. It is the result of paying the tooling charge.

Are painting or pad printing in the first number?

Only when you note those secondary operations on the RFQ. The first click prices the molded solid and the steel tool. Decoration, assembly, and packaging need a note or they stay off the first estimate.

Why did piece price move when tooling did not?

Quantity scenarios move piece price. The steel tool is the same product. See the first-order and annual fields. A smaller first lot does not rewrite the tooling line by itself.

How do I compare a competitor's blended quote to NetProto's split quote?

Ask the other shop to break the number into tooling and piece price at your first-order and annual quantities. A blended number can hide a softer tool, a different cavity count, or omitted decoration. Only compare split-to-split: same revision, same resin, same secondary scope, same Incoterms.

Does customer-supplied resin change the piece-price line or the tooling line?

Neither line auto-includes it. Write customer-supplied resin on the RFQ so reviewers price the run, not a NetProto-supplied pellet. Handling, drying, or scrap still need a note if they change the run.