Tooling quote
- Steel, cavities, cooling channels
- Paid once
- 10 business day build on qualified programs
Cycle time
Cycle time is the clock that runs on every shot. Tooling pays once; cycle time pays on every part.
Piece price clock
Injection molding cycle time searches belong in production economics, not in the tool build calendar.
NetProto does not publish cycle seconds on marketing pages. Cycle time is part specific and appears in production quotes after tooling and process are fixed.
Drivers
| Driver | Tooling role | Production role |
|---|---|---|
| Cooling layout | Built into steel | Sets wait time each shot |
| Wall thickness | DFM decision | Affects fill and cool |
| Material | Steel compatibility | Sets process window |
Quotes
Design for shorter cycles
Uniform wall thickness where possible.
Draft and rib design per DFM review.
Gate location planned with cosmetics.
DFM link

Related
Tooling lead time clock.
/injection-molding-tooling/injection-molding-lead-timeCapital versus recurring.
/injection-molding-tooling/injection-mold-costHot runner and scrap trade.
/injection-molding-tooling/hot-runner-injection-moldingMaterial library.
/plastic-injection-molding-materialsTooling hub.
/injection-molding-toolingHigh volume programs.
/high-volume-injection-moldingFAQ
No. It is part specific; use production quote.
Next step
Upload CAD for the full program picture. NetProto manufacturing is ISO 9001 certified.