One NetProto steel tool
- DFM documented before cut.
- Sampling and production on identical steel.
- Customer owns tool after tooling charge is paid.
Injection mold manufacturing
Manufacturing the mold is a sequence of documented decisions, not a black box between quote and first shots.
One sequence
Injection mold manufacturing searches often mean what happens between PO and first samples. For NetProto that path ends on the same hardened steel tool that runs reorders.
Skipping DFM or sampling steps is how programs inherit hidden second tools. This page lists the milestones buyers should see documented, not every shop floor operation. See the steel injection mold this manufacturing path builds.

Milestones
Each row is a gate, not a marketing claim.
| Milestone | What gets decided | Why it matters |
|---|---|---|
| DFM review | Draft, undercuts, gate, parting line | Fix geometry before steel is purchased |
| Steel scope agreed | Hardened steel for the program | No undisclosed grade menu on the site |
| Tool build | Cavity, cooling, ejection | Completed in 10 business days on qualified programs, depending on part size and complexity. |
| T1 sampling | Dimensions and cosmetics vs criteria | Approval tied to this cavity set |
| Production release | Same tool runs orders | Reorders skip a second tooling purchase |
Single path
Split builds add handoffs; one path keeps the same cavity identity.
Buyer visibility
If these are missing, visibility is missing.
Written DFM report with accepted and open items.
Sampling plan with dimensional and cosmetic criteria.
Tool ownership statement in the purchase terms.
Change order process for post release geometry edits.
After release
Manufacturing does not end at first article. The same tool should run repeat orders without rebilling the tooling charge.

Related process pages

Choosing the manufacturing partner.
/injection-molding-tooling/injection-mold-maker
Calendar for tool build.
/injection-molding-tooling/injection-molding-lead-time
Commercial tolerance bands.
/manufacturing-standards
Design guide hub.
/injection-mold-design-guide
Tooling category hub.
/injection-molding-tooling
Production molding services.
/plastic-injection-moldingFAQ
No. Hardened steel is selected during DFM without a public grade menu.
The tool is completed in 10 business days on qualified programs, depending on part size and complexity.
The written report lists accepted items and open items before steel is cut. It does not publish a steel grade menu or dimensional tolerances.
Sampling checks dimensions and cosmetics against the criteria agreed for that cavity set. Those measurements stay with the program. This page does not publish them.
Next step
Upload CAD to begin the documented path. NetProto manufacturing is ISO 9001 certified.