Skip to content
NetProto

Instant quote

What to Enter in the Material Field on an Instant Quote

The material dropdown or text field captures the primary resin family for fill and cost assumptions.

Instant quote

Material field plus notes

Use the field for family; put grade detail in structured notes.

The material dropdown or text field captures the primary resin family for fill and cost assumptions.

When you know the commercial grade, paste the supplier suffix in notes the same day you upload CAD.

Three resin families as colored pellets and matching molded caps labeled only by color on gray studio.

If grade is pending, write Material pending and paste performance filters below.

Quote checklist

Field content

Copy these fields into your RFQ or instant quote notes.

  • Family acronym in field

  • Grade in notes when known

  • Color and fill in notes

  • Pending flag if undecided

Examples

Examples

Weak callouts widen assumptions; specific grades tighten quotes.

FieldToo vagueBetter
KnownPA66-GF30Field: Nylon; notes: PA66-GF30 black
UnknownMaterial pendingNotes: impact housing, 0-60C, cosmetic Class B
Multi-resinOvermoldTwo lines or notes for substrate and TPE

Instant quote

Fill the quote

NetProto quote flow: upload, specify assumptions, review, submit.

  1. 1

    Select or type family

    Match dropdown when available.

  2. 2

    Expand notes

    Grade, color, fill.

  3. 3

    Set quantity

    Affects price curve.

  4. 4

    Submit for review

    Check assumptions email.

FAQ

FAQ

Change material after quote?

Update before order; assumptions refresh.

Wrong family selected?

Fix before approval to avoid DFM mismatch.

Customer-supplied resin?

Note CSR resin in comments; confirm policy separately.

Related

More RFQ guides

Links render in cards blocks only.

Next step

Start with CAD and material notes

Use the instant quote platform for pricing visibility tied to your geometry.

What to Enter in the Material Field on an Instant Quote | NetProto