Name visual, dimensional list, or FAI. Attach a ballooned drawing that matches the CAD revision. Inspect everything is not a scope.

10 min read

How to Specify Inspection Requirements on an RFQ

Inspect Everything Is Not a Specification

An inspection RFQ needs three things: which features, which report, which revision pair. Write visual on a named face, dimensional list on balloons, or FAI against the ballooned print. Tie the report to a drawing revision that matches the CAD. ISO 9001 is the quality-system mention. Inspect everything is not a scope.

Read molded part quality assurance ISO 9001 for the program view. This page only covers how to write the RFQ field.

CAD is the nominal solid; acceptance lives on the drawing or named list

The STEP file is nominal. The ballooned drawing is the acceptance source. If you write inspect everything, review still does not know which mates, which cosmetics, or which report format you will use at receiving. Name the features. Name the report. Name the revision pair.

T1 is first shots; FAI is a measured report against balloons

T1 photos are not an FAI. A verbal all good is not a record. T1 is when first shots come off the tool. FAI is a report that records measured results against the ballooned print. You can have T1 without an FAI package. Write the word you mean.

ISO 9001 is the system mention, not a feature list

ISO 9001 says the system is certified. It does not tell receiving which face to reject. Tell sourcing to write the features and the report type in plain language. Do not replace the feature list with a label.

A worked example: a housing has four screw bosses, one seal groove, and a show face. The engineer uploads CAD and writes full inspection. A complete note would say: visual on Face A, dimensional list on Balloons 4, 5, 12, and 18, FAI report against drawing Rev C matching CAD Rev C. Hidden walls stay on the commercial band unless you balloon them.

What to tell sourcing: inspection is a list plus a report type plus a revision pair. If they need a first article report, write FAI and attach the ballooned drawing. If they only need a look at the show face, write visual on that face. NetProto can review that scope on the same upload that starts the quote.

Pick the Report Type

Visual: named face plus the defect you will reject

Color, gloss, sink on a show wall, flash on a logo, witness on a keep-out: those are visual items. Write the face and the defect you will reject. Visual on the part is not a check. Visual on Face A, no paint miss, witness allowed in screw pockets is a check.

Dimensional list: balloons, mates, seal widths, snap gaps

The list should be short enough that someone can measure it. If every edge is on the list, you have not chosen critical features. Put non-critical sizes on the commercial bands in manufacturing standards for molded parts.

FAI: balloon to measured result to drawing revision

An FAI report ties each balloon to a measured result on a named drawing revision. It is not a photo of T1 parts. If you want the record, write FAI report and attach the ballooned print. For the report itself, read first article inspection for injection molding.

PPAP-style request is a named document list, not a level number

If you need a PPAP-style package, list the documents you want in notes. This page does not invent a level or a default package.

Inspect everything measures nothing. Balloons 4, 5, 12, 18 measure something.

A worked split: Face A visual, no gate vestige. Balloons 4 and 12 dimensional. FAI on those balloons plus material identity against the named grade. T1 still happens as first shots. Do not write T1 FAI as if that were one object.

Tie Inspection to the Revision Pair

CAD revision and drawing revision must match

If the solid moved a snap and the print still shows the old gap, say which document wins, then align them. Review will not invent a balloon for a face that exists only in one file.

Balloon IDs visible on both files

Point the FAI or dimensional list at those balloons. A drawing that lives only in email is not the acceptance source. Face callouts belong on a 2D drawing for quote callouts.

Material cert tied to the grade in the material field

If you need that paper, say material cert to the named grade. If you do not, do not paste a stack of certificate names. The grade field and this note should agree.

Cosmetic class on a show face is a visual inspection item

Write the class on the face and say visual. Do not write inspect cosmetics as a global flag.

A worked drawing tie: Drawing Rev C, CAD Rev C. Balloons 4, 5, 12, 18 critical. Face A cosmetic visual. Material cert to the ABS grade in the RFQ. FAI report on the four balloons. Drawing current is not a revision.

What to tell sourcing: the drawing is the contract for inspection. The CAD is the contract for the solid. If they disagree, stop the quote and fix the pair. A fast upload with mismatched revisions creates two acceptance stories.

RFQ Paste Block

Use this list before anyone treats the quote as quality-scoped. Each step is a file or a word you can point to.

  1. List critical features or attach a ballooned drawing.
  2. Choose visual, dimensional list, or FAI report.
  3. Write the drawing and CAD revision that match.
  4. Keep ISO 9001 as the quality-system mention.
  5. Upload CAD through the injection molding instant quote platform.

A worked submit block: CAD Rev C, drawing Rev C. Visual Face A. Dimensional Balloons 4, 5, 12, 18. FAI report on those balloons. Material cert to named ABS. ISO 9001. No inspect-everything line. That block is usable.

What to tell sourcing: send this checklist with the CAD. If FAI is required for the first production lot, write that. If only T1 photos are required, write T1 photos and do not call them FAI. Hold the number as inspection-complete only after the report type is named.

Common mistakes at submit:

  • Writing FAI T1 PPAP in one box.
  • Attaching an unmarked PDF and calling it ballooned.
  • Asking for inspect to commercial and tight on the same edge.
  • Leaving the quality field blank because the drawing exists in another folder.

Quote guides

Related quote and RFQ guides

Next articles in this cluster. Files, RFQ fields, and what happens after you accept.

Frequently Asked Questions

How do I specify inspection requirements on an RFQ?

Name the features to measure, choose visual, a dimensional list, or an FAI report, and tie that choice to a drawing revision that matches the CAD revision. Do not write inspect everything. Upload the print with the CAD so review sees the same acceptance source.

Is T1 the same as FAI?

No. T1 is the timing of first shots off the tool. FAI is a documented report of measured results against the ballooned drawing. You can receive T1 parts without an FAI package if that is the scope you write.

Do I need FAI on every program?

No. Many programs accept a visual check or a short dimensional list. Write FAI when you need the recorded balloon results. Empty quality fields do not create an FAI, and they do not create a visual plan either.

Can I ask for PPAP on this page?

You can write a PPAP-style request on the RFQ when the program needs those documents. List the documents you want. This page does not invent a level or a default package. Scope stays in the notes.

Where do I put the ballooned drawing?

Attach it to the same RFQ as the CAD and type both revision IDs. Point the FAI or dimensional list at those balloons. A drawing that lives only in email is not the acceptance source.

What if I do not have a ballooned drawing yet?

List critical features by face or balloon and say a ballooned drawing will follow on the same revision. Review can scope visual or dimensional intent from that list, but FAI still needs the ballooned print attached before it is a first article record.

Can inspection scope live on the secondary-operations RFQ?

Yes. Visual, dimensional, or FAI checks after molding can be scoped on the same program when the features and report type are named. Inspection is a quality line next to CAD, resin, quantity, and finishing. It is not a substitute for naming the report.

Do I need a material certificate on every molding RFQ?

Only when you will reject on grade identity. Write material cert to the named grade and make sure that grade is in the material field. If you do not need the paper, do not paste a stack of certificate names. ISO 9001 coverage does not replace a graded cert.

Ready to quote

Ready to validate your design?

Upload your CAD. Reviewers can flag DFM notes and return pricing on the same package. Paste this before upload: CAD revision plus ballooned drawing on the same rev, visual or dimensional or FAI choice, material cert to the named grade, and ISO 9001 noted. Review scopes quality from the same package that starts the mold quote.