Prototype injection molding
Prototype injection molding should answer design questions with parts that match production, not parts from a throwaway cavity.
Parts intent
This query is about molded parts for validation, not about buying a separate prototype mold SKU.
First shots off the NetProto hardened steel tool function as your prototypes because they come from the tool that will run production. Prototype tooling is compared with first articles from this hardened steel tool.

Part source
Before you order prototype parts
List tests the parts must pass (fit, drop, environmental).
Mark cosmetic surfaces on CAD.
Identify open design questions for DFM.
Term overlap
| Search | This page focus | Sibling page |
|---|---|---|
| Prototype injection molding | Getting parts | /injection-molding-tooling/prototype-injection-molding |
| Prototype tooling | Buying a validation mold | /injection-molding-tooling/prototype-tooling |
DFM first

Related

Validation mold concept.
/injection-molding-tooling/prototype-tooling
Molded parts on a launch date from the steel tool you keep.
rapid injection molding
Program economics.
/injection-molding-tooling/injection-mold-cost
Tolerances for prototypes.
/manufacturing-standards
Tooling hub.
/injection-molding-tooling
Instant quote.
/instant-quote-platformFAQ
No MOQ; small orders run on the same steel tool.
There is no fixed prototype quantity. There is no minimum order quantity, and the same hardened steel tool runs later orders.
A very small first order often costs more per part than a later order on the same steel tool. Piece price is quoted per order.
Design changes after the steel tool is cut are quoted separately. Open questions belong in DFM before the first shots.