What Does It Mean to Quote Before the Design Is Final?

Teams ask can i quote injection molding before the design is final when electronics, seals, or cosmetics are still moving. An early quote uses the current solid and the RFQ notes you can stand behind today. It is a planning number plus DFM flags, not a freeze of the steel.

When the solid or the notes change, the next quote is a new package. Read why instant quote changes after CAD review. This page only answers timing.

Key Facts

  1. You can upload CAD before every face and resin grade is locked.
  2. Early review is useful for moldability and cost drivers, not for a frozen price.
  3. Mark pending faces, pending resin, and pending tolerances on the RFQ.
  4. A later revision needs a new quote record tied to the new revision ID.
  5. DFM feedback is part of quoting. See injection molding DFM review.
  6. No prices or lead times appear on this page.
  7. Upload the current solid on the injection molding instant quote platform.

What an Early Quote Is For

Find undercuts, keep-outs, and thick sections while the solid can still move. Give sourcing a planning range labeled as revision-bound. Do not treat the first click as a purchase order.

Find undercuts and thick bosses while CAD can still move

An early upload is for moldability notes you can still act on. Read DFM flags before tooling release for the design-side list. The first record is a planning estimate bound to one revision, not a steel release.

Settle a grain-vs-tight-band argument before steel

An early quote is also useful when two teams disagree about whether a face can hold a grain or a tight band. The flag arrives while the CAD can still change. That note is cheaper to take now than after steel is cut.

What to Mark as Not Final

Pending faces — name them, do not write "WIP"

Faces that will change after electronics or seal reviews. Write the face name. A generic WIP note does not help a reviewer.

Pending resin — family known, commercial grade open

Resin family known, commercial grade pending. List the filters you already know: heat, impact, chemical, cosmetic.

Pending cosmetic — show faces still matter even if grain system is open

Cosmetic grain or polish not yet picked. Say which faces are show faces even if the grain system is open.

RFQ Checklist

Numbered steps:

  1. Export the current released-for-review solid.
  2. Write design not final plus the revision ID in notes.
  3. List pending resin, finish, and tolerance items.
  4. When the solid changes, follow how to re-quote after a CAD revision.
  5. Upload CAD through the injection molding instant quote platform.

If a teammate wants to wait for a final file, ask which pending item blocks DFM. Most pending items do not. Upload now, then re-quote.

A Worked Example

A sensor bracket still has an open connector keep-out. The resin family is nylon. The commercial grade is not picked. The 2D is two weeks out. The team can still upload the current solid today. Write design not final, name the keep-out face, and list nylon plus the filters you already know: heat, moisture, and a wear surface.

DFM can flag the keep-out and the thick boss while those faces can still move. Sourcing gets a planning number bound to revision C. When the connector freezes and the grade locks, re-quote revision D. The first record is not wasted. It is the reason the boss changed before steel.

If the team waits for final, they often wait until the 2D title block is signed. Waiting for the 2D title block is later than DFM needs. Final for quoting means the faces you can stand behind today, plus a written pending list.

Common Mistakes

Uploading a solid and saying nothing about pending faces. Reviewers will treat open faces as locked.

Sending three early quotes with three different pending lists and asking sourcing to pick the lowest number. They are not the same program.

Waiting for the 2D when the only open item is a balloon on a non-critical edge. Start with 3D. Mark 2D pending.

Treating an early quote as a freeze so nobody will upload again. Write not final on the record so the next revision is expected.

What to Tell Sourcing

The current number is bound to the current revision and the pending list. It is usable for planning. It is not a freeze. When the keep-out or the grade locks, a new record will replace it. Keep the old record so the delta is visible.

If they want one number for a budget gate, give them the revision ID and the pending list with that number. A budget gate without a pending list will be reopened later.

Do not wait for the 2D title block if the solid can already show DFM risk. Mark 2D pending. Upload now.

If two early quotes exist, do not pick the lower one without reading the pending lists. The lower early quote may just have more faces still open.

Visual reference

3D solid used for an early injection molding quote while the 2D drawing is marked pending
RFQ notes marking pending resin, pending faces, and a revision ID

Quote guides

Related quote and RFQ guides

Next articles in this cluster. Files, RFQ fields, and what happens after you accept.

Frequently Asked Questions

Can I quote injection molding before the design is final?

Yes. You can upload the current solid and the RFQ notes you can stand behind today. The early number is a planning estimate plus DFM flags. When the solid or the notes change, re-quote the new revision. Do not treat the first click as a freeze.

Will the first number stay if I only change a logo?

A logo or a keep-out change is still a new solid. Re-quote and keep both revision IDs. The delta may be small. The records should still be tied to different files so sourcing does not mix them.

Should I wait for the 2D drawing?

No. Start with the 3D solid. Mark 2D pending in notes. Add the drawing when balloons, inserts, or finish notes exist. Waiting for a fully ballooned sheet delays DFM on faces that can still move.

Can I get DFM feedback without a finished 2D drawing?

Yes. Start with the 3D solid. Mark 2D pending. DFM can flag undercuts, thick bosses, keep-outs, and draft while geometry can still move. Add balloons, inserts, and finish notes when the drawing exists. Do not block the first review on a title block.

Is an early quote legally binding or just planning?

An early quote is a planning estimate bound to one CAD revision and one pending list. It is not a PO and not a steel release. When the solid, material, or tolerance fields change, open a new quote record and keep the old one so the delta is auditable.

What if only the resin is still open?

Quote with the family or a pending-material note. List heat, impact, chemical, and cosmetic filters. Re-quote when the commercial grade locks. The solid can stay on the same revision if only the material field changed.

How do I keep two early quotes from being compared as equals?

Write the revision ID and the pending list on both records. Tell sourcing which faces were still open. Two early quotes are comparable only when the pending list matches.

Ready to quote